INDEPENDENT SCHOOL DISTRICT #911 ADVERTISEMENT FOR BIDS

INDEPENDENT SCHOOL DISTRICT #911
ADVERTISEMENT FOR BIDS
TITLE: ISANTI PRIMARY SCHOOL – CLASSROOM ADDITIONS &
VISITOR MANAGEMENT
REMODELING
LOCATION OF WORK: Isanti Primary School
301 Heritage Blvd NW Isanti, MN 55040
OWNER: Cambridge-Isanti Public School District, ISD #911
625A Main Street North Cambridge, MN 55008 (763) 689-6188 FAX: (763) 689-6200
OWNER’S REPRESENTATIVE: ICS Consulting, Inc.
5354 Edgewood Dr. Mounds View, MN 55112 (763) 354-2670 FAX: (763) 780-2866
Contacts: Scott Johnson
scottj@ics-consult.com
ARCHITECT: MLA Architects
12 Long Lake Road, Suite 17 St. Paul, MN 55115 (651) 770-4442 FAX: (651) 770-1987
Contacts: Rich Rodich
rrodich@architectsmla.com
MECHANICAL AND
ELECTRICAL ENGINEER: Dolejs Associates, Inc
1624 N. Riverfront Dr. Mankato, MN 56001 (507) 625-7869 FAX: (507) 388-9225
Mechanical Contact: Mike Dolejs
mdolejs@dolejsinc.com
Electrical Contact: Chris Dolejs cdolejs@dolejsinc.com
PROJECT DESCRIPTION:
Approximately 5,200 square foot classroom additions on north end of building and visitor entry remodeling. Kindergarten classrooms to include bathrooms within the classroom space. Work to include but not limited to: Bituminous Paving, Concrete Paving, Site Grading and Excavation, Steel Stud Framing, Concrete Masonry Units, Gypsum assemblies, Aluminum Storefront, Doors, Door Hardware, Finishes, Fire Protection Piping Installation, HVAC Piping & Duct Distribution, RTU Install, Reheat Coils, Radiant Ceiling Panels, Plumbing Piping Alterations and New Install, Electrical Service and Distribution.
BID DATE AND LOCATION:
Sealed bids will be received at Cambridge-Isanti Public School Education Center, 625A Main St. N., Cambridge MN, 55008, then publicly opened and read aloud. Bids will be received and stamped-in prior to 2 PM local time on April 10th 2014.
EXAMINATION OF DOCUMENTS:
Bidders may obtain drawings and specifications for the project from Franz Reprographics or the office of the Program Manager.

http://www.franzrepro.com

Follow link to “Franz Plan Room’ for ability to download, order and view plans and specifications. This link will also provide locations of Builders Exchanges holding plans for contractors to access.
BIDDING REQUIREMENTS:
Each bidder must comply with the following requirements to reassure acknowledgment recognition of their bids:
Bids must be accompanied by bid security in form of certified check, cashier’s check, or bid bond in amount of 5% of base bid submitted, made payable to owner, as guarantee that bidder will, if awarded, enter into contract in accordance with contract documents and submitted bid.
Submit bid in duplicate on the prescribed form, which is furnished with the specification, with full name and address of the bidder.
Completely fill in all blank spaces on the Bid Form, in ink or typewriter, in both words and figures.
Sign in longhand, executed by a principal duly authorized to enter into an agreement. If a bidder is a co¬partnership, then signatures on the bid shall be by an authorized member of the firm, with names and addresses of each member of partnership.
Base bid and all alternate bids shall be stated both in writing and in figures. In all cases, written and numerical figures must agree; otherwise at Owner’s option, it shall be cause for rejection of bid. Complete form without alteration.
Submit alternate prices (bid) for either increasing or decreasing the cost as called for on bid form and Description of Alternates. Submit a bid for all alternates.
Owner may make such investigations as he deems necessary to determine the ability and responsibility of the bidder to perform the work, and any bidder shall furnish to Owner all such information and data for this purpose, as the Owner may request. Owner reserves the right to reject any bid if the evidence submitted by, or investigation of, such bidder fails to satisfy the Owner that such bidder is properly qualified to carry out the obligations of the contract and to complete the Work contemplated therein. The competence and responsibility of bidder will be considered in making an award, including, but not limited to: (1) proof of financial responsibility, (2) quality of similar work, (3) amount of experience with similar projects, (4) facilities, personnel and equipment, (5) reputation for performance, and (6) ability to complete the work within specified time. Owner reserves the right to reject any Bid where there is reasonable doubt as to the qualifications of the bidder.
Owner reserves the right to (1) accept bidder’s Base Bid only, (2) accept any one or more of bidder’s Alternate Bids, in any order regardless of the order in which they were listed, (3) reject all Bids, (4) award contract based on his investigation of bidders, as well as acceptance of alternates, all of which Owner deems to be in his best interest, (5) waive informalities or minor irregularities in bids and waive minor irregularities or discrepancies in bidding procedure.
Upon award of Contract, Contractor shall provide AIA A312 Performance and Payment Bonds in the amount of 100% of Contract Sum in accordance with General Conditions and Amendments to General Conditions.
BIDDING DOCUMENTS & SITE REVIEW:
Each bidder (including subcontract bidder where appropriate) is required to visit the site and to fully inform himself and record his own investigations as to the extent of the Work, the extent of the work performed by other contractors under other construction packages, conditions under which the Work is to be performed, existing buildings and streets, conditions of the area, existing utilities and other features, type of soil, available facilities and difficulties that may be encountered in connection therewith, and other relevant items which will affect his bid or the Work.
Prior to submitting a bid, each bidder is required to examine all of the bidding requirements, all Contract Documents, all drawings and specifications for the Project (including those primarily for other Subcontracts), become thoroughly familiar with the scope of the Project and all factors and items of work which will affect his bid or the Work, whether shown or specified in documents primarily for Work of others or Work of this Contract.
No extras will be allowed the Contractor as a result of misunderstanding of the extent of scope of the Work as a result of his failure to study and record his own findings. Submission of a bid shall be proof that such examinations have been made and that bidder has recorded his own investigation and has become thoroughly familiar with all contract documents (including all addenda). The failure or omissions of any bidder to examine any form, instrument or document shall in no way relieve any bidder from any obligation in respect to his bid.
PRE-BID CONFERENCE:
A pre-bid conference will be held at 3:30 PM local time on March 31st 2014 at Isanti Primary School. Bidders are required for attending and familiarizing themselves with all site conditions. No extras will be allowed because of the bidder’s misinterpretation to the amount of work involved, bidder’s own error, negligence, or failure to examine the site.
START DATE:
Work may begin after receipt of the signed contract from the Owner. Pre-construction and submittals work related to the project is to commence immediately after receipt of the signed contract. The work on the premise is anticipated to begin Spring of 2014.
SUBSTANTIAL AND COMPLETION DATE:
Owner requires work to be substantially complete on or before milestone dates as listed in Summary of Work, Section 01 01 00. Bids shall reflect all costs necessary to meet this schedule requirement. Substantial completion is set for August 22th, 2014 and final completion is on August 27th, 2014.
Published in the Isanti County News April 2, 9, 2014 196404

Comments Closed

up arrow